The implementation of an AUGIER energy transmission network makes it easy to power remote sites.
AREAS OF APPLICATION
AUGIER supply solutions are particularly suitable for supplying energy over long distances.
CONCRETE APPLICATION OF OUR SOLUTION
Maintenance of a nuclear site
Project features TOTAL POWER: 200 kVA or 400 kVA TRANSPORT VOLTAGE: 6,600 V NETWORK LENGTH: According to the 6,600 V loop of each nuclear power plant LOCATION: France YEAR: For over 30 years to the present day PROJECT OBJECTIVES To supply electrical equipment for...
Securing a nuclear site
Project features TOTAL POWER: 2x50 kVA — 2 substations TRANSPORT VOLTAGE: 3,200 V single phase NETWORK LENGTH: 2,500 meters LOCATION: France YEAR: 2021 & 2026 PROJECT OBJECTIVES The security fence lighting system uses light points distributed over 2,500 meters,...
Tema Oil Terminal
Project features TOTAL POWER: 800 kVA TRANSPORT VOLTAGE: 6,600 V NETWORK LENGHT: 3,000 meters LOCATION: Ghana YEAR: 2021 PROJECT OBJECTIVES Power supply for the heating tracing of a 10‑inch pipeline over 3,000 meters.Power supply for a heating resistance up to 160 °C,...
El Merk Oil Field
Project features TOTAL POWER: 3600 kVA TRANSPORT VOLTAGE: 5,500 V NETWORK LENGHT: 70 feeders – up to 12 km per feeder LOCATION: Algeria YEAR: 2010 to 2026 PROJECT OBJECTIVES Power supply to 144 wells (injectors, production wells, water and oil), dispersed over an area...
Réunion Port
Project features TOTAL POWER: 2x1,000 kVA TRANSPORT VOLTAGE: 5,500 V NETWORK LENGHT: 1,100 meters LOCATION: Réunion Island YEAR: 2023 PROJECT OBJECTIVES Provide electrical power supply to 9 large lighting masts, booster pumps and a crane, on the quays of the port of...
Lomé port
Project features TOTAL POWER: 630 kVA TRANSPORT VOLTAGE: 5,500 V NETWORK LENGHT: 1,500 to 5,000 meters following network departure LOCATION: Togo YEAR: 2014 PROJECT OBJECTIVES Provide power supply for port lighting over long distances. Power supply for masts in...
HKB bridge – Cocody / Marcory
Project Features TOTAL POWER: 2x160 kVA TRANSPORT VOLTAGE: 5,500 V NETWORK LENGTH: 6,600 mètres LOCATION: Ivory Coast YEAR: 2014 PROJET OBJECTIVES Build a toll bridge between Cocody and Marcory to allow a significant time saving when connecting the two municipalities....
Cocchi Technologies: the Group holding company is established
The Aretè Cocchi Technology Group announces an important evolution of its corporate identity: the Group has officially adopted the new name Cocchi Technologies. The change in name marks the establishment of Cocchi Technologies as the Group holding company, bringing...
Signalling power supply – LGV Bordeaux Dax
Project features TOTAL POWER: 250 kVA TRANSPORT VOLTAGE: 950 V NETWORK LENGTH: 50 KM LOCATION: France YEAR: 2018 PROJET OBJECTIVES Powering remote receivers spread over 50 kilometres of track while retaining existing cables and tripling the power output. CUSTOMER...
Telecommunications power supply – LGV Maroc
PROJECT FEATURES TOTAL POWER: 200 kVA TRANSPORT VOLTAGE: 3200 V NETWORK LENGTH: 85 KM LOCATION: Maroc YEAR: 2016 PROJECT OBJECTIVES Power supply to several remote sites for signalling and telecommunications. Sites located 750 metres to 7,800 metres away from the...