Our references across the globe

From airports to power stations, to military sites and their infrastructures, AUGIER Energy is here to ensure the continuity of service and the security of electrical power supply.

Maintenance of a nuclear site

Maintenance of a nuclear site

 Project features TOTAL POWER: 200 kVA or 400 kVA TRANSPORT VOLTAGE: 6,600 V NETWORK LENGTH: According to the 6,600 V loop of each nuclear power plant LOCATION: France YEAR: For over 30 years to the present day PROJECT OBJECTIVES To supply electrical equipment for...

Securing a nuclear site

Securing a nuclear site

 Project features TOTAL POWER: 2x50 kVA — 2 substations TRANSPORT VOLTAGE: 3,200 V single phase NETWORK LENGTH: 2,500 meters LOCATION: France YEAR: 2021 & 2026 PROJECT OBJECTIVES The security fence lighting system uses light points distributed over 2,500 meters,...

Tema Oil Terminal

Tema Oil Terminal

Transmission of 800 kVA distributed over 3,000 meters, from a single available power source located at the beginning of the installation.

El Merk Oil Field

El Merk Oil Field

From ten electrical substations, 70 medium-voltage 5,500 V network feeders supply loads over several kilometers. Each 5,500 V feeder supplies between one and three step-down substations.

Réunion Port

Réunion Port

Project features TOTAL POWER: 2x1,000 kVA TRANSPORT VOLTAGE: 5,500 V NETWORK LENGHT: 1,100 meters LOCATION: Réunion Island YEAR: 2023 PROJECT OBJECTIVES Provide electrical power supply to 9 large lighting masts, booster pumps and a crane, on the quays of the port of...

Lomé port

Lomé port

Project features TOTAL POWER: 630 kVA TRANSPORT VOLTAGE: 5,500 V NETWORK LENGHT: 1,500 to 5,000 meters following network departure LOCATION: Togo YEAR: 2014 PROJECT OBJECTIVES Provide power supply for port lighting over long distances. Power supply for masts in...

HKB bridge – Cocody / Marcory

HKB bridge – Cocody / Marcory

Project Features TOTAL POWER: 2x160 kVA TRANSPORT VOLTAGE: 5,500 V NETWORK LENGTH: 6,600 mètres LOCATION: Ivory Coast YEAR: 2014 PROJET OBJECTIVES Build a toll bridge between Cocody and Marcory to allow a significant time saving when connecting the two municipalities....