The implementation of an AUGIER energy transmission network makes it easy to power remote sites.
AREAS OF APPLICATION
AUGIER supply solutions are particularly suitable for supplying energy over long distances.
CONCRETE APPLICATION OF OUR SOLUTION
Réunion Port
Project features TOTAL POWER: 2x1,000 kVA TRANSPORT VOLTAGE: 5,500 V NETWORK LENGHT: 1,100 meters LOCATION: Réunion Island YEAR: 2023 PROJECT OBJECTIVES Provide electrical power supply to 9 large lighting masts, booster pumps and a crane, on the quays of the port of...
Lomé port
Project features TOTAL POWER: 630 kVA TRANSPORT VOLTAGE: 5,500 V NETWORK LENGHT: 1,500 to 5,000 meters following network departure LOCATION: Togo YEAR: 2014 PROJECT OBJECTIVES Provide power supply for port lighting over long distances. Power supply for masts in...
HKB bridge – Cocody / Marcory
Project Features TOTAL POWER: 2x160 kVA TRANSPORT VOLTAGE: 5,500 V NETWORK LENGTH: 6,600 mètres LOCATION: Ivory Coast YEAR: 2014 PROJET OBJECTIVES Build a toll bridge between Cocody and Marcory to allow a significant time saving when connecting the two municipalities....
Cocchi Technologies: the Group holding company is established
The Aretè Cocchi Technology Group announces an important evolution of its corporate identity: the Group has officially adopted the new name Cocchi Technologies. The change in name marks the establishment of Cocchi Technologies as the Group holding company, bringing...
Signalling power supply – LGV Bordeaux Dax
Project features TOTAL POWER: 250 kVA TRANSPORT VOLTAGE: 950 V NETWORK LENGTH: 50 KM LOCATION: France YEAR: 2018 PROJET OBJECTIVES Powering remote receivers spread over 50 kilometres of track while retaining existing cables and tripling the power output. CUSTOMER...
Telecommunications power supply – LGV Maroc
PROJECT FEATURES TOTAL POWER: 200 kVA TRANSPORT VOLTAGE: 3200 V NETWORK LENGTH: 85 KM LOCATION: Maroc YEAR: 2016 PROJECT OBJECTIVES Power supply to several remote sites for signalling and telecommunications. Sites located 750 metres to 7,800 metres away from the...
A1 Highway – Lighting and Power Supply
PROJECT FEATURES TOTAL POWER: 400 kVA TRANSPORT VOLTAGE: 5500 V NETWORK LENGTH: 20 km LOCATION: France YEAR: 2025 PROJECT OBJECTIVES Power supply for ramp lighting, road equipment, traffic management, variable message signs, cameras, tolls and rest areas....
Securing a military site
PROJECT FEATURES TOTAL POWER: 2x80 kVA - 2 substations TRANSPORT VOLTAGE:5500 V NETWORK LENGTH:2000 meters LOCATION: France YEAR: 2025 PROJECT OBJECTIVES Secure a military site by powering receivers distributed along the 2-kilometer-long protective fence. For...
Military shooting range
PROJECT FEATURES TOTAL POWER: 1600 kVA - 4 substations TRANSPORT VOLTAGE:5500 V NETWORK LENGTH: between 2600 and 10300 meters LOCATION: France YEAR: 2016 PROJECT OBJECTIVES Power supply targets on four different shooting ranges, targets spread over 48 km. Monitor the...
A355 – Strasbourg highway
PROJECT FEATURES TOTAL POWER: 75 kVA TRANSPORT VOLTAGE:3200 V three-phase NETWORK LENGTH: 25 km LOCATION: Strasbourg - France YEAR: 2020 PROJECT OBJECTIVES Power supply for road equipment, variable message signs, CCTV, radars, vehicle counting stations, weather...