OUR ADVANTAGES OVER THE COMPETITOR
The implementation of an AUGIER energy transmission network makes it easy to power remote sites.
AREAS OF APPLICATION
AUGIER supply solutions are particularly suitable for supplying energy over long distances.
CONCRETE APPLICATION OF OUR SOLUTION
Aretè Cocchi Technology Group celebrates its new U.S. headquarters near Chicago
Local officials joined Aretè Cocchi Technology's corporate team and local managers and employees to celebrate its new high-tech U.S. headquarters in Franklin Park, Illinois, on May 22, 2024. The new base unites four business units in a 27,000-square-foot building with...
Oran port
Project feautures TOTAL POWER: 2 x 800 kVA TRANSPORT VOLTAGE: 5500 V NETWORK LENGHT: Great site LOCATION: Algeria YEAR: 2023 PROJECT OBJECTIVES Distribute significant electrical power over a large site, by optimizing cable cross sections and achieving energy savings...
Ré island bridge
Project feautures TOTAL POWER: 100 kVA TRANSPORT VOLTAGE: 3200 V NETWORK DISTANCE: 2900 M LOCATION: France YEAR: 2023 PROJECT OBJECTIVES Reduce cable cross sections to facilitate their implementation. Increase the distributed power rating to allow the securing and...
Normandie bridge – Grand canal viaduct
Project feautures TOTAL POWER: 800 kVA TRANSPORT VOLTAGE: 5500 V NETWORK DISTANCE: 8 KM LOCATION: France YEAR: 2022 PROJECT OBJECTIVES Reduce cable cross-sections and use electrical equipment designed to operate in wetlands. No electrical source available on bridge....
Powering bungalows – French Polynesia Islands
PROJECT FEAUTURES TOTAL POWER: 250 kVA TRANSPORT VOLTAGE: 5500 V NETWORK DISTANCE: 800 M LOCATION: French Polynesia YEAR: 2023 PROJECT OBJECTIVES Power supply of the bungalows of a hotel from the energy produced by solar panels (remote loads from solar panels)....
Supply power to a regional logistics platform
PROJECT FEAUTURES TOTAL POWER: 630 kVA TRANSPORT VOLTAGE: 5500 V NETWORK DISTANCE: 300 M LOCATION: France YEAR: 2023 PROJECT OBJECTIVES Transport 630 kVA over 300 meters while reducing cable sections and line losses to optimize the energy produced and facilitate its...
Powering Oil Well Heads – Project Touat Gas, Algeria
Project feautures TOTAL POWER: 50 kVA TRANSPORT VOLTAGE: 3200 V NETWORK DISTANCE: 4 KM LOCATION: Touat Gas, Algeria YEAR: 2018 PROJECT OBJECTIVES To achieve the power supply of the instrumentation for wellsites Oil&Gas, spreaded in the Algerian Sahara. The typical...
Powering Kerian Hydro Hydroelectric Power Station pumps, Malaysia
Project feautures TOTAL POWER: 64 kVA TRANSPORT VOLTAGE: 3200 V NETWORK DISTANCE: 5 KM LOCATION: Perak, Malaysia YEAR: 2016 PROJECT OBJECTIVES Supplying power to pumps in a hydroelectric power station over a distance of 3km. CUSTOMER NEEDS Site with difficult access...
Power supply of the valve heads of a dam on the island of Reunion
Project feautures TOTAL POWER: 100 kVA TRANSPORT VOLTAGE: 5500 V NETWORK DISTANCE: 4.2 KM LOCATION: Takamaka, Reunion Island YEAR: 2016 PROJECT OBJECTIVES Supplying power to dam equipment - valve heads, pumps over a distance of 4.2 km from a 400V source....
Lighting management city of Carros, France
Project feautures TOTAL POWER: 100 kVA TRANSPORT VOLTAGE: 180 V NETWORK DISTANCE: 10 KM LOCATION: Carros - Le Broc, France YEAR: 2015 PROJECT OBJECTIVES Achieve savings in public lighting for industrial and residential area of Carros under the NICE GRID project....