Outdoor Lighting

OUR ADVANTAGES OVER THE COMPETITOR

The implementation of a medium-voltage energy distribution network reduces cable cross-sections, lowers costs, facilitates installation and powers lighting up to 50km.

AREAS OF APPLICATION

AUGIER’s energy transportation solutions are particularly suited to powering roads, ring roads, motorways, security fences and all other large sites.

CONCRETE APPLICATION OF OUR SOLUTION

Lighting of a parking stadium

Lighting of a parking stadium

 Project features TOTAL POWER: 160 kVA TRANSPORT VOLTAGE: 5,500 V NETWORK LENGTH: 2 departure of 1000 meters LOCATION: Lyon, France YEAR: 2014 PROJECT OBJECTIVES Carry out the electrical supply for the lighting of the car parks of the Grand Stade de Lyon, the bus...

Lighting for a toboggan run

Lighting for a toboggan run

 Project features TOTAL POWER: 10 kVA TRANSPORT VOLTAGE: 950 V single phase NETWORK LENGTH: 3500 meters LOCATION: France YEAR: 2013 PROJECT OBJECTIVES Provide the electrical supply for the lighting of a luge track consisting of 15 poles equipped with two 70w metal...

Louvre-Lens Museum

Louvre-Lens Museum

 Project features TOTAL POWER: 250 kVA TRANSPORT VOLTAGE: 5500 V three phase NETWORK LENGTH: 3300 meters LOCATION: Lens, France YEAR: 2012 PROJECT OBJECTIVES Install the electrical power supply for the lighting masts, gates, event power bollards, cameras, and...

Securing a nuclear site

Securing a nuclear site

 Project features TOTAL POWER: 2x50 kVA — 2 substations TRANSPORT VOLTAGE: 3,200 V single phase NETWORK LENGTH: 2,500 meters LOCATION: France YEAR: 2021 & 2026 PROJECT OBJECTIVES The security fence lighting system uses light points distributed over 2,500 meters,...

Lomé port

Lomé port

Project features TOTAL POWER: 630 kVA TRANSPORT VOLTAGE: 5,500 V NETWORK LENGHT: 1,500 to 5,000 meters following network departure LOCATION: Togo YEAR: 2014 PROJECT OBJECTIVES Provide power supply for port lighting over long distances. Power supply for masts in...

HKB bridge – Cocody / Marcory

HKB bridge – Cocody / Marcory

Project Features TOTAL POWER: 2x160 kVA TRANSPORT VOLTAGE: 5,500 V NETWORK LENGTH: 6,600 mètres LOCATION: Ivory Coast YEAR: 2014 PROJET OBJECTIVES Build a toll bridge between Cocody and Marcory to allow a significant time saving when connecting the two municipalities....

Oran port

Oran port

Project features TOTAL POWER: 2 x 800 kVA TRANSPORT VOLTAGE: 5500 V NETWORK LENGHT: Great site LOCATION: Algeria YEAR: 2023 PROJECT OBJECTIVES Distribute significant electrical power over a large site, by optimizing cable cross sections and achieving energy savings...

Normandie bridge – Grand canal viaduct

Normandie bridge – Grand canal viaduct

Project feautures TOTAL POWER: 800 kVA TRANSPORT VOLTAGE: 5500 V NETWORK DISTANCE: 8 KM LOCATION: France YEAR: 2022 PROJECT OBJECTIVES Reduce cable cross-sections and use electrical equipment designed to operate in wetlands. No electrical source available on bridge....

Penang Bridge Lighting

Penang Bridge Lighting

Project feautures TOTAL POWER: 1260 kVA TRANSPORT VOLTAGE: 6600 V NETWORK DISTANCE: 17 KM LOCATION: Penang, Malaysia YEAR: 2013 PROJECT OBJECTIVES Light the bridge on 17 km with poles equipped with 70W, 150W and 400W HPS lamps. CUSTOMER NEEDS Power transformers...

Borgo Vescovato ring road lighting, Corsica

Borgo Vescovato ring road lighting, Corsica

Project feautures TOTAL POWER: 50 kVA TRANSPORT VOLTAGE: 950 V NETWORK DISTANCE: 1.3 KM LOCATION: Borgo, Corse YEAR: 2012 PROJECT OBJECTIVES Supplying power to the ring road lighting. CUSTOMER NEEDS Energy source (400V) available from beginning of installation....