From airports to power stations, to military sites and their infrastructures, AUGIER Energy is here to ensure the continuity of service and the security of electrical power supply.

Réunion Port

Réunion Port

Project features TOTAL POWER: 2x1,000 kVA TRANSPORT VOLTAGE: 5,500 V NETWORK LENGHT: 1,100 meters LOCATION: Réunion Island YEAR: 2023 PROJECT OBJECTIVES Provide electrical power supply to 9 large lighting masts, booster pumps and a crane, on the quays of the port...

Lomé port

Lomé port

Project features TOTAL POWER: 630 kVA TRANSPORT VOLTAGE: 5,500 V NETWORK LENGHT: 1,500 to 5,000 meters following network departure LOCATION: Togo YEAR: 2014 PROJECT OBJECTIVES Provide power supply for port lighting over long distances. Power supply for masts in...

HKB bridge – Cocody / Marcory

HKB bridge – Cocody / Marcory

Project Features TOTAL POWER: 2x160 kVA TRANSPORT VOLTAGE: 5,500 V NETWORK LENGTH: 6,600 mètres LOCATION: Ivory Coast YEAR: 2014 PROJET OBJECTIVES Build a toll bridge between Cocody and Marcory to allow a significant time saving when connecting the two...

Tamarins road equipment

Tamarins road equipment

PROJECT FEATURES TOTAL POWER: 1880 kVA TRANSPORT VOLTAGE:5500 V / 950 V NETWORK LENGTH: 30 km LOCATION: Reunion Island - France YEAR: 2008 PROJECT OBJECTIVES Power supply for road equipment, traffic management, variable message signs, cameras, structures (viaduct a...

Perimeter protection

Perimeter protection

Project features TOTAL POWER: 210 kVA TRANSPORT VOLTAGE:3200 V NETWORK LENGTH: between 260 & 2350 meters LOCATION: France YEAR: 2024 PROJECT OBJECTIVES Electrify 77 km of fencing, divided into different zones of lengths ranging from 260 to 2,350 meters. Power...

Oran port

Oran port

Project features TOTAL POWER: 2 x 800 kVA TRANSPORT VOLTAGE: 5500 V NETWORK LENGHT: Great site LOCATION: Algeria YEAR: 2023 PROJECT OBJECTIVES Distribute significant electrical power over a large site, by optimizing cable cross sections and achieving energy savings...