OUR ADVANTAGES OVER THE COMPETITOR
With LV power source, typically 230-400V, a high-level of power transported will require substantial cable cross-sections. For the same level of power, if you increase the voltage of transport you will reduce the current. Thus meaning that you can substantially reduce the cross-sections of your cable. The higher the voltage, the farther you go!!! Augier solutions are perfectly suited to supply power to your remote loads that are located from 500m to 50km away from the power source!
It is a very unique and simple solution that allows you to create an intermediate voltage energy distribution network that is installed underground.
AREAS OF APPLICATION
AUGIER’s solutions boosts electrical energy for all existing installations requiring a stronger power while keeping the original cables in place.
CONCRETE APPLICATION OF OUR SOLUTION
Lighting management city of Carros, France
Project feautures TOTAL POWER: 100 kVA TRANSPORT VOLTAGE: 180 V NETWORK DISTANCE: 10 KM LOCATION: Carros - Le Broc, France YEAR: 2015 PROJECT OBJECTIVES Achieve savings in public lighting for industrial and residential area of Carros under the NICE GRID project....
Energy Saving – Talant Tunnel
Project feautures TOTAL POWER: 200 kVA TRANSPORT VOLTAGE: 180 V NETWORK DISTANCE: 1.5 KM LOCATION: Dijon, France YEAR: 2015 PROJECT OBJECTIVES Regulation and variation of the supply voltage of tunnels with a lengh of 1.5km Variation of the lighting intensity at the...
Tunnel ring road Lyon, France
Project feautures TOTAL POWER: 100 kVA TRANSPORT VOLTAGE: 180 V NETWORK DISTANCE: 4 KM LOCATION: Lyon, France YEAR: 2015 PROJECT OBJECTIVES Regulation of the voltage supply and variation of intensity for the lighting along 4km of the tunnel. Remote control and...
Saving energy in a city of Haute-Savoie
Project feautures TOTAL POWER: 12 kVA TRANSPORT VOLTAGE: 180 V NETWORK DISTANCE: 1.2 KM LOCATION: Evian, France YEAR: 2011 PROJECT OBJECTIVES The city had to decrease the energy consumption of a street lighting network using 64 HPS 150 W lamps. CUSTOMER NEEDS Without...
Project Mafraq highway lighting
Project feautures TOTAL POWER: 6000 kVA TRANSPORT VOLTAGE: 6600 V NETWORK DISTANCE: 74 KM LOCATION: Mafraq, UAE YEAR: 2010 PROJECT OBJECTIVES Powering highway lighting, 90 km long with more than 1500 poles each of 2000W. CUSTOMER NEEDS Cope with inadequate energy...
Lighting Management – Estéron
Project feautures TOTAL POWER: 100 kVA TRANSPORT VOLTAGE: 180 V NETWORK DISTANCE: 5 KM LOCATION: Vallée de L'Estéron, France YEAR: 2009 PROJECT OBJECTIVES Security of public lighting installations and reduction in the city lighting consumption. Management of 60 public...