Transformer Substation PTMI & PTM
Technical documentation of Transformer Substation PTMI & PTM
For more information, download our product leaflet.
IMPLEMENTED of Transformer Substation PTMI & PTM
Discover our references around the world using AUGIER technologies.
Tunnel Inelfe – Lighting – Work phase
Tunnel Inelfe – Lighting – Work phase
Project feautures TOTAL POWER: 100 kVA TRANSPORT VOLTAGE: 5500 V NETWORK DISTANCE: 8.4 KM LOCATION: Santa Logaia, Spain YEAR: 2012 PROJECT OBJECTIVES Tunnel lighting from 0 to 5000 meters Lighting power supply - 200 Fluo 56 W lamps and two 20 kW pumps from the...
Oil Storage Lighting – Marine Terminal, Russia
Oil Storage Lighting – Marine Terminal, Russia
Project feautures TOTAL POWER: 100 kVA TRANSPORT VOLTAGE: 950 V NETWORK DISTANCE: 5.5 KM LOCATION: Novorossiysk, Russia YEAR: 2001 PROJECT OBJECTIVES Safety perimeter lighting, 5.5 km with 175 masts and site lighting (263 masts). CUSTOMER NEEDS Safeguard lighting...