Find here all topics related to this category
Bridges do not allow the physical installation of transformer stations. To transport electrical energy over long distances, Augier offers compact, robust and easy-to-implement solutions.
THEY PUT THEIR TRUST IN US OUR REFERENCES ACROSS THE GLOBE
Traffic control, variable message signs, cameras, roadwork (viaduct and tunnel). Equipment spread across 30km without any energy source available.
Find out moreAfter an audit and technical analysis, Augier provided the products to supply power for the service area: powering the toilets, lighting and signage.
Find out moreObjective: Supply power to the GSM-R communication network from a 400V source situated at a distance of 600m.
Find outmoreSupply electrical power to 9 large lighting masts and boosters, on the quay of a port on Reunion Island
Find Out moreObjective: To power 120 gas/oil wellheads, dispersed across 2500km2 in Algeria
Find out moreObjective: To illuminate the tunnel from 0 to 5000m. Lighting power supply – 200 56kW fluorescent lamps and two 20kW pumps for the construction area of the tunnel.
Find Out moreObjective: Extension of Eurotunnel Freight parking lighting with 3.3kV voltage available.
Find Out more