Powering Oil Well Heads – Project Touat Gas, Algeria

Home 5 References 5 Powering Oil Well Heads – Project Touat Gas, Algeria

Project feautures

  • TOTAL POWER: 50 kVA
  • TRANSPORT VOLTAGE: 3200 V
  • NETWORK DISTANCE: 4 KM
  • LOCATION: Touat Gas, Algeria
  • YEAR: 2018

PROJECT OBJECTIVES

To achieve the power supply of the instrumentation for wellsites Oil&Gas, spreaded in the Algerian Sahara.

The typical loads are pumps, electrovalves, HPU motors and control panels.

CUSTOMER NEEDS

Power supply for wellsites equipment in difficult weather conditions (wind, dust) with large temperature variations (0 ° C to 55 ° C).

CUSTOMER NAME 

TECHNICAS REUNIDAS

OUR SOLUTIONS IMPLEMENTED

Studies carried out in collaboration with the engineers of FOSTER WHEELER and PESPEN led to the creation of substations, each substation supplying a single-phase network transformer. The maximum distance between one substation and one well is 4km. The 3200 V 10+10 mm² cable is buried and the transformers are installed in a pit, sheltered from bad weather and vandalism.

MATERIAL USED

Six outdoor step-up substations, equipped with 230 V / 3200 V single phase watertight transformers. Six watertight, IP68, step-down transformers, to be installed in a concrete pit. Six concrete pit fitted with a safety interlock and regulatory signs. 21 km of 3200 V concentric two poles cable.

CUSTOMER BENEFITS

BURIED SOLUTION, NO AIRLINE

SMALL CABLE CROSS SECTION

QUICK INSTALLATION REDUCED MAINTENANCE