Project feautures

  • TOTAL POWER: 64 kVA
  • TRANSPORT VOLTAGE: 3200 V
  • NETWORK DISTANCE: 5 KM
  • LOCATION: Perak, Malaysia
  • YEAR: 2016

PROJECT OBJECTIVES

Supplying power to pumps in a hydroelectric power station over a distance of 3km.

CUSTOMER NEEDS

Site with difficult access (jungle) and severe climate conditions (water, average of 80% humidity), with a cable of small cross section.

CUSTOMER NAME 

KERIAN ENERGY

OUR SOLUTIONS IMPLEMENTED

SET-UP SUBSTATIONS WITH AN INDOOR CABINET (PTS), EQUIPPED WITH A THREE-PHASE WATERTIGHT STEP-UP TRANSFORMER, FOR TRANSPORTING ENERGY WITH A 10MM² CROSS SECTION CABLE.

STEP-DOWN SUBSTATIONS WITH AN INDOOR CABINET (PTS), EQUIPPED WITH A THREE-PHASE WATERTIGHT STEP-DOWN TRANSFORMER TO SUPPLY THE PUMPS FOR DAMS.

MATERIAL USED

2 transformer substations with an indoor cabinet (PTS), equipped with a three-phase 400V / 3.2kV 32KVA watertight step-up transformer
2 transformer substations with an indoor cabinet (PTS), equipped with a three-phase 3.2kV / 400V 32KVA watertight step-down transformer

CUSTOMER BENEFITS

WATERTIGHT TRANSFORMERS (IP68) AND CORROSION RESISTANT, OFFERING A LONGER LIFETIME

LOW CABLE SECTION REDUCES COSTS UP TO 30%

SPECIALLY ADAPTED TO THE CONDITIONS OF THE SITE