From airports to power stations, to military sites and their infrastructures, AUGIER Energy is here to ensure the continuity of service and the security of electrical power supply.
Power supply of a service area on a highway
Project feautures TOTAL POWER: 50 kVA TRANSPORT VOLTAGE: 950 V NETWORK DISTANCE: 0.65 KM LOCATION: A6, France YEAR: 2008 PROJECT OBJECTIVES Supply the sanitaries, the lighting, the signalings. CUSTOMER NEEDS To carry 50 kVA on 650 meters to supply the uses of a...
Multimodal site – Dourges, France
Project feautures TOTAL POWER: 2500 kVA TRANSPORT VOLTAGE: 5500 V NETWORK DISTANCE: 6 KM LOCATION: Dourges, France YEAR: 2002 PROJECT OBJECTIVES Supply 5.5kV – lighting railways and platforms Railways:- Power supply of 22 masts distributed over two 5500 V...
Oil Storage Lighting – Marine Terminal, Russia
Project feautures TOTAL POWER: 100 kVA TRANSPORT VOLTAGE: 950 V NETWORK DISTANCE: 5.5 KM LOCATION: Novorossiysk, Russia YEAR: 2001 PROJECT OBJECTIVES Safety perimeter lighting, 5.5 km with 175 masts and site lighting (263 masts). CUSTOMER NEEDS Safeguard lighting...
Suspended Bridge Lighting, China
Project feautures TOTAL POWER: 1600 kVA TRANSPORT VOLTAGE: 5500 V NETWORK DISTANCE: 15.6 KM LOCATION: Hong Kong, China YEAR: 1995-1996 PROJECT OBJECTIVES Power supply for lighting of the longest (15.6 km) cable-suspension bridge in China. Power supply of video...