From airports to power stations, to military sites and their infrastructures, AUGIER Energy is here to ensure the continuity of service and the security of electrical power supply.
Penang Bridge Lighting
Project feautures TOTAL POWER: 1260 kVA TRANSPORT VOLTAGE: 6600 V NETWORK DISTANCE: 17 KM LOCATION: Penang, Malaysia YEAR: 2013 PROJECT OBJECTIVES Light the bridge on 17 km with poles equipped with 70W, 150W and 400W HPS lamps. CUSTOMER NEEDS Power transformers...
Borgo Vescovato ring road lighting, Corsica
Project feautures TOTAL POWER: 50 kVA TRANSPORT VOLTAGE: 950 V NETWORK DISTANCE: 1.3 KM LOCATION: Borgo, Corse YEAR: 2012 PROJECT OBJECTIVES Supplying power to the ring road lighting. CUSTOMER NEEDS Energy source (400V) available from beginning of installation....
Tunnel Inelfe – Lighting – Work phase
Project feautures TOTAL POWER: 100 kVA TRANSPORT VOLTAGE: 5500 V NETWORK DISTANCE: 8.4 KM LOCATION: Santa Logaia, Spain YEAR: 2012 PROJECT OBJECTIVES Tunnel lighting from 0 to 5000 meters Lighting power supply - 200 Fluo 56 W lamps and two 20 kW pumps from the...
Tunnel – Fréjus, France – Lighting – construction phase
Project feautures TOTAL POWER: 500 kVA TRANSPORT VOLTAGE: 5500 V NETWORK DISTANCE: 12 KM LOCATION: Bardonnèche, France YEAR: 2011 PROJECT OBJECTIVES Supply lighting to the SNCF tunnel at Fréjus; a length of 7000m with two 58W lamps every 10 meters. Voltage...
Saving energy in a city of Haute-Savoie
Project feautures TOTAL POWER: 12 kVA TRANSPORT VOLTAGE: 180 V NETWORK DISTANCE: 1.2 KM LOCATION: Evian, France YEAR: 2011 PROJECT OBJECTIVES The city had to decrease the energy consumption of a street lighting network using 64 HPS 150 W lamps. CUSTOMER NEEDS...
Power supply of aids to navigation middle east
Project feautures TOTAL POWER: 600 kVA TRANSPORT VOLTAGE:4160 V NETWORK DISTANCE: 5 KM LOCATION: Middle East YEAR: 2010 PROJECT OBJECTIVES Powering airport air traffic control systems, with precise control and guaranteed monitoring. CUSTOMER NEEDS Equipment located...
Project Mafraq highway lighting
Project feautures TOTAL POWER: 6000 kVA TRANSPORT VOLTAGE: 6600 V NETWORK DISTANCE: 74 KM LOCATION: Mafraq, UAE YEAR: 2010 PROJECT OBJECTIVES Powering highway lighting, 90 km long with more than 1500 poles each of 2000W. CUSTOMER NEEDS Cope with inadequate energy...
Lighting Management – Estéron
Project feautures TOTAL POWER: 100 kVA TRANSPORT VOLTAGE: 180 V NETWORK DISTANCE: 5 KM LOCATION: Vallée de L'Estéron, France YEAR: 2009 PROJECT OBJECTIVES Security of public lighting installations and reduction in the city lighting consumption. Management of 60...
Safety enclosure power supply at an airport, U.A.E
Project feautures TOTAL POWER: 630 kVA TRANSPORT VOLTAGE: 5500 V NETWORK DISTANCE: 16 KM LOCATION: Fujairah, UAE YEAR: 2008 PROJECT OBJECTIVES Réaliser l’alimentation électrique de l’éclairage des murs d’enceinte de sécurité de l'aéroport de Fujairah, aux UAE....
Power supply of a service area on a highway
Project feautures TOTAL POWER: 50 kVA TRANSPORT VOLTAGE: 950 V NETWORK DISTANCE: 0.65 KM LOCATION: A6, France YEAR: 2008 PROJECT OBJECTIVES Supply the sanitaries, the lighting, the signalings. CUSTOMER NEEDS To carry 50 kVA on 650 meters to supply the uses of a...
Multimodal site – Dourges, France
Project feautures TOTAL POWER: 2500 kVA TRANSPORT VOLTAGE: 5500 V NETWORK DISTANCE: 6 KM LOCATION: Dourges, France YEAR: 2002 PROJECT OBJECTIVES Supply 5.5kV – lighting railways and platforms Railways:- Power supply of 22 masts distributed over two 5500 V...
Oil Storage Lighting – Marine Terminal, Russia
Project feautures TOTAL POWER: 100 kVA TRANSPORT VOLTAGE: 950 V NETWORK DISTANCE: 5.5 KM LOCATION: Novorossiysk, Russia YEAR: 2001 PROJECT OBJECTIVES Safety perimeter lighting, 5.5 km with 175 masts and site lighting (263 masts). CUSTOMER NEEDS Safeguard lighting...