Borgo Vescovato ring road lighting, Corsica

Home 5 References 5 Borgo Vescovato ring road lighting, Corsica

Project feautures

  • TOTAL POWER: 50 kVA
  • TRANSPORT VOLTAGE: 950 V
  • NETWORK DISTANCE: 1.3 KM
  • LOCATION: Borgo, Corse
  • YEAR: 2012

PROJECT OBJECTIVES

Supplying power to the ring road lighting.

CUSTOMER NEEDS

Energy source (400V) available from beginning of installation.

Possibility of network extension

CUSTOMER NAME 

RAFFALLI

OUR SOLUTIONS IMPLEMENTED

  • TRANSPORT ELECTRICAL ENERGY AT 950V FROM A TRANSFORMER STATION.
  • EACH VOLTAMAX IS INSTALLED DIRECTLY IN THE POLE.
  • CABLE SECTION 950 V U1000R2V 3X16MM2.

MATERIAL USED

Step-up substation PT BTM 50 kVA 400V / 950 V – aluminium substation,outdoor type, installed on a concrete slab.
117 Voltamax transformers 150T 950V / 230V, Voltamax installed in the pole

AUGIER energy transport solutions are designed for overcoming obstacles such as cost, network quality and distance. For more than 60 years, we have provided efficient and optimised solutions to some of the largest roads, bridges, ports and other transportation infrastructures.

CUSTOMER BENEFITS

WATERTIGHT TRANSFORMERS (IP68) AND CORROSIONB RESISTANT, OFFERING A LONGER LIFETIME

CENTRALISED CONTROL WITH ONLY ONE SUB-NETWORK

NO LOW VOLTAGE SUB-NETWORK