PROJECT OBJECTIVES
Light the bridge on 17 km with poles equipped with 70W, 150W and 400W HPS lamps.
CUSTOMER NEEDS
Power transformers suspended over water, between two traffic lanes, from two transformer stations to ensure safe lighting.
CUSTOMER NAME
JAMBATAN KEDUA SDN BHD (JKSB)