Louvre-Lens Museum

Home 5 References 5 Louvre-Lens Museum

 Project features

  • TOTAL POWER: 250 kVA
  • TRANSPORT VOLTAGE: 5500 V three phase
  • NETWORK LENGTH: 3300 meters
  • LOCATION: Lens, France
  • YEAR: 2012

PROJECT OBJECTIVES

Install the electrical power supply for the lighting masts, gates, event power bollards, cameras, and retractable bollards at the Louvre-Lens Museum.

CUSTOMER NEEDS

Powering from only one transformer substation, equipment that is permanently energized and distant lighting systems, with the equipment distributed over 3,300 meters.

CUSTOMER NAME 

OUR SOLUTIONS IMPLEMENTED

Transmit electrical energy from a transformer substation equipped with two 5,500 V contactor feeder circuits. These network feeders supply watertight step-down transformers installed in underground pit. The power supply is configured as two half-loops to ensure system reliability. The 5,500 V cable (3x1x25 mm² cross-section) supplies all the network transformers.

MATERIAL USED

  • One cell with two 5,500 V contactor feeders,

  • 10 watertight, IP68-rated TER transformers, ranging from 10 kVA to 32 kVA, 5,500 V / 400 V.

CUSTOMER BENEFITS

Centralised power supply from only one substation

Watertight (IP68) and corrosion resistant transformers

5500 V network cross-section cable 3x1x25 mm²